Click here to return to Messiah College's homepage
Click here to return to the Department of Facility Services homepage
Quicklinks

 
Construction Projects Home
   
Current Projects:
Bullet North Complex Underground
Hot Water Storage Tank
Bullet Mellinger Apartment Projects
President's Residence
ECC-HVACC Replacement
Naugle Dehumidification
Frey Hall Solar Project
Fine Arts Miller Auditorium Stage Lighting
Treona Parking Lot
Kline Fume Hood Replacement
Anderson Field Resurfacing
Chapel Fire Alarm System
Oakes Museum Dehumidification
   
Completed Projects:
bullet Musser Farm House Demolition
Sports Center Fire Alarm System
Pool Renovations
Boyer Hall Emergency Generator
Fry Apartment Renovations
Barlett/Hamner Demolition
Kline Hall
Harrisburg Institute
Anderson Field
   
Contractor and Consultant Database Sign-up
Plan Room
Resource Room

Related Links:
   

Frey Hall - Solar Project

July 2008 -

The solar pavilion is completed.  We are now waiting for it to be connected to the PPL power grid.

View of completed Solar Pavilion          Completed Solar Pavilion

 

May 28, 2008 -

The pavilion was completed by the end of the semester.  Connection to the electrical grid will take place over the summer.

The roofing is started    Work on the roof.     Completed roof

 

April 21, 2008 -

The Solar Scholar team that is part of the Energy Group of the Collaboratory has received grant money and donations to build a photovoltaic training facility.  This open air pavilion will be located on the southeast corner of Frey Hall.  The structure was designed by Gannett Fleming, Inc.  Wohlson Construction is the general contractor.  The Solar Scholar team is providing labor to install the solar arrays as well as the electrical system that give about 3.2 kw of power to the building.  This work is being conducted under the supervision of Fullerton Electric.  The project broke ground on April 10th and is expected to be completed by the end of the semester.

 

  Ground breaking     Starting the ground work.    Preparing footers

Placing support poles      Preparing solar panels     Solar panels in place.


 