Click here to return to Messiah College's homepage
Department of Facility Services

Electrical Shutdowns

 

 

January 2010 -

Both electrical shutdowns happened as scheduled without any incidents.

 

 

December 2009 -

On Tuesday, December 22, 2009 Climenhage Fine Arts Center will have an electrical shutdown from 8am to 12noon.  This shutdown is required by PPL to remove an off peak meter that is on the building.  As soon as work is completed, electrical power will be restored.  On Monday, December 28, 2009 Frey Hall will have an electrical shutdown from 8am to 12noon.  This shutdown is required by PPL also to remove an off peak meter that is on the building.  As soon as work is completed, the power at this location will be restored as well.