July 21, 2010

Work on the dormer above the stacks is underway.

 

Dormers

 

The brick work at the front walk is almost complete.

The eaves have been covered with vinyl.

 

Outside Eave

 

Vinyl Covered Eave

June 2010 -

Updates forthcoming.

 

Murray Library exterior work project  

 

Murray Library exterior work 6.16.2010

 

May 2010 -

Work is scheduled to start middle to end of June 2010.

April 2010 -

During summer 2010, exterior repair work to Murray Library will be taking place.  This work includes covering the fascia and sophet at the building as well as the "Pizza Hut".  The front steps will also have brick work done.