Click here to return to Messiah College's homepage
Department of Facility Services

South Gate Bridge Repairs

 

Finished look of South Gate Bridge Repairs

May 2010 -

The South Gate Bridge Repair project is completed.

 

April 2010 -

Due to water erosion, the South Gate Bridge wall collapsed.  They are currently pouring concrete for wing walls.

March 19, 2010 Photos (before input on webpage)

 

South Gate Bridge Repairs 3.19.2010  

 

South Gate Bridge Repairs

 

South Gate Bridge Repairs 3.19.2010  

 

South Gate Bridge Repairs 3.19.2010

April 8, 2010 Photos

South Gate Bridge Repairs 4.8.2010  

 

South Gate Bridge Repairs 4.8.2010

 

South Gate Bridge Wing Walls 4.8.2010  

 

South Gate Bridge Repairs 4.8.2010

 

 April 21, 2010 (final stage; paving was done today)   

South Gate Bridge paving