Storm Water and Sewer Improvements

July 21, 2010 -

New storm water system has been installed from the loading dock of Campus Center around the rear of the Sports Center out to Collge Avenue.  This work included increasing the size of the underground pipe to accomodate more storm water.  As part of this project the Sports Center parking lot has been repaved.

 

June 2010 -

Update forthcoming.

 

Storm water sewer project 6.11.2010

 

Black topping behind ECC/SSC 5.28.2010   

 

Blacktopping continued behind ECC/SSC 5.28.2010

May 2010 -

The new drainage system has been installed behind Eisenhower Campus Center (ECC) and Sollenberger Sports Center (SSC).  The contractor will be black topping the whole parking area May 28, 2010 in these areas.  Work will continue down College Avenue towards the site of the Old Schoolhouse.

 

Outside SSC Storm Water Sewer project 5.26.2010  

 

Storm Water Sewer Treatment project 5.27.2010

 

Behind Sollenberger Sports Center 5.17.2010  

 

Behind Sollenberger Sports Center

April 2010 -

This project is to improve storm water flows and correct some issue with sewer piping infrastructures.  There are several areas on campus that will be excavated so that these enhancements can be made.  These areas are the following: behind North complex leading down to Sollenberger Sports Center; the area in front of Bertram House up to Grantham Road; the area behind Eisenhower Campus Center and area in front of Eisenhower Campus Center going down to Old Main.

 

Behind Sollenberger Sports Center  

 

Behind Sollenberger Sports Center  

 

On the side of Sollenberger Sports Center