Messiah College is partnering with the Harristown Development Corportation to provide a new location for the Harrisburg Institute and the Harrisburg Residential Program. The new home is located on Dewberry Street at the corner of Chestnut in downtown Harrisburg. The building will provide several offices for the Harrisburg Institute, meeting space, a resident director's apartment and housing for 25 students.

The project will be completed by August 15, 2007.

Questions regarding the project should be directed to Kathie Shafer, Vice President for Operations.

Questions regarding the work of the Harrisburg Institute should be directed to David Hietala, Director of the Harrisburg Institute.

Questions regarding housing opportunities should be directed to Craig Dalen, Director of Community Life in Harrisburg.

Update (August 10, 2007)
The work is completed at the Harrisburg Institute. The contractor is completing punch list items. Furniture is being delivered August 14-16. The elevator has passed inspection and we are waiting for the city to issue an occupancy permit. We are ready for students to move in.

Update (July 30, 2007)
The work at the new home of the Harrisburg Institute is finishing up. In the next two weeks there will be required inspections, delivery of furniture and small items to complete. The building will be ready for students to move in at the end of August.

Update (July 1, 2007)
Work continues to progress ahead of schedule.

  • All cabinets are installed
  • Painting is completed
  • VCT tile flooring is installed
  • Ceiling tiles are being installed
  • Lighting is being installed
  • Carpet is being installed
  • Work on the new stair tower is progressing
Update (June 2, 2007)
  • Drywall is hung on the second floor and the painters have begun to prime everything.
  • Cabinets to start being installed the week of June 4th.
  • Exterior work continues to proceed as scheduled.
Update (May 4, 2007)
Work continues to proceed as scheduled. On the interior, framing out of all the spaces is finishing up and dry wall will soon be hung. Exterior repair work on the brick is finishing up and windows on the second floor have been installed.

Pictures:
(Please click on any of the pictures below to see a larger image.)

Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
Tower Entrance with Parking
2nd Floor Hallway Complete
Exterior Entrance with Mailboxes
Plaza and Parking
Click here to see a larger version of the picture      
RD Kitchen
     
       
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
Exterior Entrance
Apartment Kitchen
Classroom
Doors to be Installed
Click here to see a larger version of the picture Click here to see a larger version of the picture    
Entrance Looking on Chestnut
Entrance Tile
   
       
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
Workroom
Elevator Install
Exterior Stair Tower
Public Restroom Tile
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
Residence Room
Second Floor
Second Floor Hallway
Shower
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
Stair Tower
RD Apartment
2nd Floor Hallway Carpet
ADA Apartment
Click here to see a larger version of the picture Click here to see a larger version of the picture    
Elevator
Public Restroom
   
       
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
RD Apartment
2nd Floor Hallway
2nd Floor Room
Exterior Entrance
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
Break Room
Brick and Window Work
Dry Wall Work
Second Floor Room
Click here to see a larger version of the picture Click here to see a larger version of the picture    
Second Floor Shower Unit
Stud Work
   
       
Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture Click here to see a larger version of the picture
RD Apartment
2nd Floor Work
Classroom Space
Foundation for Entrance Addition
   
Click here to see a larger version of the picture
Click here to see a larger version of the picture
Click here to see a larger version of the picture
Click here to see a larger version of the picture
Harrisburg Institute Exterior
Interior Work
Interior Work in 1st Floor Lounge Space
Office Space